First slide

Track Records

Learn More

Tuas Water Reclamation Plant Contract 3D2 – Domestic Liquids Module 2- MEICA
Erection of Integrated Waste Management Facility (IWMF) EPC Package 2- Sludge Incineration Facility and Food Waste Treatment Facility
Tuas Water Reclamation Plant Contract 3D1 – Domestic Liquids Module 1 – MEICA and NEWater
Tuas Water Reclamation Plant Contract 3A – Industrial Liquids Modules – Civil and Structural Works (MEICA Package)
Tuas Water Reclamation Plant Contract 3C – Domestic Liquids Modules – Civil and Building Services (MEICA Package)
Replacement of Aged Equipment at Bedok and Pulau Tekong Waterworks
Replacement of Reverse Osmosis Membrane at Tuas South Desalination Plant
Replacement of Low Pressure Reverse Osmosis Membrane at Tuas South Desalination Plant
Process Upgrading and Equipment Replacement at Chestnut Avenue Waterworks
Upgrading of M&E Equipment and laying of Pipeline at Tembusu Pumping Station
Jurong Water Reclamation Plant Phase 4 Expansion (Contract 1 - Liquids)
Construction of Stamford Detention Tank and Ancillary Facilities
Waste-to-Energy Project at a Poultry Farm
Second Changi NEWater Plant, Design – Build – Own – Operate (DBOO) Project
Provision of Sludge Pre-Treatment Facility at Ulu Pandan Water Reclamation Plant
Proposed Used Water Lift Station at Jurong Water Reclamation Plant
Upgrading Works at Kranji II Pumping Station - Pumping Plant, Switch Room Building and Ancillary Works
Contract 2 - Proposed Membrane Plant at Changi Water Reclamation Plant
Relocation of Substation and Pumphouse at Singapore Changi Airport
Expansion to Digesters and Effluent Pumping Station at Changi Water Reclamation Plant
Improvement Works at Changi Water Reclamation Plant
Construction of Waste Water Treatment Plant for Ascendas-Protrade Singapore Tech Park
Life Support Systems Works for Marine Life Park for Resorts World Sentosa
Enhancement & Upgrading of Used Water Pumping Installations - Contract 3
Development of a Ceramic Membrane Demonstration Plant at Choa Chu Kang (CCK) Waterworks
Marina Reservoir Recirculation Scheme - Contract 3 Modifications to Chestnut Avenue Waterworks
Co-Generation System to Gardens by the Bay
Replacement of M&E Equipment at Jurong Water Reclamation Plant
Hengyang Songmu Water Supply Plant
Construction of Rainwater Harvesting and Treatment Plant for Universal Studios Singapore
Liaocheng Waste Water Treatment Plant
Upgrading of existing water treatment plant at Choa Chu Kang Waterworks
Odour Control Systems (Contract EP5) for the Deep Tunnel Sewerage System at Changi Water Reclamation Plant
Changi Water Reclamation Plant Contract C3C Liquid Module 1
Replacement of M&E Equipment at Ulu Pandan Water Reclamation Plant
Recirculated Seawater Treatment System at Marine Aquaculture Centre in St John’s Island