2025 - The treatment units of the Kranji Water Reclamation Plant (KWRP) were constructed in three major phases and have a combined total design flow capacity of 151,000 cubic metres per day (m³/day). UES Holdings Pte Ltd was awarded this contract for the replacement and upgrading/modification of a number of mechanical and electrical equipment, including necessary civil and structural works, temporary works and demolition works. These works include decommissioning, dismantling and disposal of existing equipment and replacing them by designing, supplying, installing, testing and commissioning new equipment.
Date of Completion: Ongoing
Country: Singapore